Electrical commissioning
Switchgear, UPS and battery systems, generators and transfer switches. Load bank testing through energization.
Specialist search for US data center builds. Every engineer is screened level by level, L1 to L5, before an employer sees a name.
Electrical, mechanical and controls commissioning. Nothing else.
US data center builds, wherever the site is.
Every profile shows the levels performed, the levels led and the megawatts.
Switchgear, UPS and battery systems, generators and transfer switches. Load bank testing through energization.
Chillers, CRAH units and fan walls, liquid-cooling loops. Flow, pressure and heat-load testing.
Sequence-of-operations testing and point-to-point checkout across BMS, EPMS, PLC and SCADA.
The people who write the scripts, run integrated systems testing and hand the building over.
Built for commissioning firms, controls integrators, electrical and mechanical contractors, and owner teams.
The expensive hire is the one who learns IST on your schedule.
A resume says “data center commissioning.” We say which levels, which systems and how many megawatts.
What they witnessed at the factory, and what they flagged before it shipped.
Whether they checked installed equipment against the drawings themselves.
What they started up alongside the vendor.
Which system tests they ran, and which scripts they wrote.
Whether they have led an IST, at how many megawatts, and what tripped first.
Specimen profile.An illustration of the format, not a real candidate.
Done means performed under a lead. Led means they ran it.
Screen note
Wrote the L4 scripts for UPS and generator paralleling gear. On the second IST a main-tie-main transfer did not complete on loss of utility. Explains the cause, the fix and the retest without prompting.
For employers
Twenty minutes on the role, the site, the systems and the rotation.
One page. One fee, due when your hire starts.
A short list of profiles in the format above. Names follow once each engineer agrees to be put forward for your role.
We schedule interviews, manage the offer and stay close through notice and the first weeks on site.
No named resume reaches you without the engineer's permission.
If a role sits outside commissioning and controls, we tell you and step aside.
Contract and contract-to-hire engagements are arranged case by case: ask us about the role.
Every permanent placement carries a 90-day guarantee: if the engineer leaves or is let go in that time, we search for a replacement at no further fee. Conditions are in our terms of business.
For engineers
Pay, per diem and rotation in the first message, where we know them.
We put you forward one named role at a time, with your written permission each time. If the employer has not engaged us yet, we tell you before you decide.
By voice or in writing, at a time you choose. The voice version is run by an AI interviewer with your consent. A person reviews every result, and software never turns anyone down.
Tell us which you want, or both.
Loadbank Talent is a founder-led search desk for the commissioning and controls engineers who bring US data centers into service. A load bank puts a real electrical load on generators and UPS systems before a data center goes live. We took the name because the work is the same: prove it under load before anyone depends on it.
UK-registered, working US hours. Calls run 9 am to 2 pm Eastern, Monday to Friday.
For hiring managers. We reply within one business day.
Two minutes. We reply with roles that fit, or tell you we have none right now.